The Design for Safety Process, in Plain English

Design for Safety review follows a structured process — commonly referred to by the acronym GUIDE in Singapore's WSH Council guidance — that repeats and adapts as a project moves from concept to completion and beyond.

In brief

GUIDE stands for the stages a DfS review typically works through: identifying who is affected, assessing risk, and driving design decisions toward eliminating or reducing that risk. In practice, review meetings are held at concept design, detailed design and pre-construction stages, with further reviews whenever the design, method or risk profile changes materially.

Project lifecycle, from plan to handover

1

Plan

Scope the DfSP engagement and brief the project team on the DfS process.

2

Review design

Convene DfS review meetings with the Developer, Designers and Contractor to identify foreseeable risks.

3

Record decisions

Transfer identified hazards into Design Risk Records and meeting minutes.

4

Communicate residual risks

Issue the Register so residual risks and controls are known to those who face them.

5

Monitor actions

Track outstanding design-risk actions and call follow-up reviews as needed.

6

Handover register

Hand the up-to-date DfS Register to the Developer at project completion (TOP).

A simplified view of how DfS review activity threads through a project. In practice, stages 2–5 repeat at each design milestone and whenever the design or construction approach changes.

How this maps to project stages

Design for Safety activity by project stage
Project stageTypical DfS activity
Concept & feasibilityInitial DfSP briefing; first identification of major foreseeable design risks while the design is still flexible.
Detailed designStructured DfS review meetings across permanent, specialist and temporary works design; Design Risk Records opened and tracked.
Pre-constructionReview with the appointed Contractor on construction-method-related design risks before work starts on site.
Construction-stage design changesFollow-up review whenever a design, method statement, temporary works scheme or access arrangement changes materially.
Completion & handoverDfS Register finalised and handed to the Developer at Temporary Occupation Permit (TOP) stage.
Future use, cleaning, maintenance, alteration & demolitionResidual-risk information in the handed-over Register informs how the building is later operated, maintained, altered and eventually demolished.
Professional boundary

Additional DfS reviews may be required whenever the design, construction method, temporary works, access arrangements or risk profile of a project changes after the original review — not only at the fixed milestones above.

What happens in a review meeting

Who is considered

Reviews consider people who carry out or are affected by construction work, people for whom the finished structure is a workplace (including those who later clean or maintain it), and people affected by its eventual demolition.

What is discussed

Foreseeable design risks are identified and, where reasonably practicable, eliminated through design. Where elimination is not reasonably practicable, risk is reduced at source, with collective protective measures generally preferred over individual protective measures.

Read more: what happens during a DfS review meeting →